Work day beginning around 9 AM. Work to focus on preparing the facilities for the 8/19 concert event. Please Bring: Water, Snacks/lunch, Gloves, Sunblock, Rake,Wheel Barrow, and a smile! 1. Rake and spread wood chips on the “dance floor” 2. Split and Stack Firewood under lodge 3. Clean out inside lodge 4. Clean and organize lodge area post Hazardous Fuels Reduction project 5. Clean and refinish deck railing 6. Enjoy the hill on a Saturday afternoon!